A place for your miners to run

Compare hosting locations, understand the costs and send us the details of your setup.

Cutaway shipping container with racks of ASIC miners

Before your miners arrive

Review the equipment, costs and handover documents with our team before arranging placement.

  1. Check the equipment

    Share the miner model, rated power, cooling type and quantity. We review whether the equipment fits the hosting offer before discussing placement.

  2. Review the full cost

    Read the electricity rate, mandatory service fee and applicable setup cost together. An availability enquiry does not reserve capacity.

  3. Confirm the handover

    Confirm the hosting agreement, equipment list and handover document before the equipment begins its hosting period.

  4. Keep the scope clear

    Monitoring belongs to the monthly service scope. Repairs, preventive maintenance and collection arrangements are discussed separately under the stated terms.

Hosting in photos

  • Two-tier racks of mining equipment in a hosting hall
  • Air-cooled miners with their power and network connections
  • Air-cooled miners on orange metal shelves
  • Mining equipment beside installed racks
  • Rows of air-cooled miners along a hosting aisle

Choose a hosting location

Reference terms checked on 15 October 2026. We confirm availability and your placement terms before you commit.

Calculate hosting costs
Available for enquiries

United States

Cutaway illustration of a mining container — United States
€0.075/ kWh

Plus 15 EUR per miner / month for monitoring.

We confirm space and equipment suitability when reviewing your enquiry.

Estimate costs here
Available for enquiries

Norway

Cutaway illustration of a mining container — Norway
€0.078/ kWh

Plus 15 EUR per miner / month for monitoring.

We confirm space and equipment suitability when reviewing your enquiry.

Estimate costs here
Currently full

Finland

Cutaway illustration of a mining container — Finland
Ask about the waiting list

The reference offer has no spaces available. Ask us about future availability.

Ask about future availability
Currently full

Estonia

Cutaway illustration of a mining container — Estonia
Ask about the waiting list

The reference offer has no spaces available. Ask us about future availability.

Ask about future availability
Currently full

Latvia

Cutaway illustration of a mining container — Latvia
Ask about the waiting list

The reference offer has no spaces available. Ask us about future availability.

Ask about future availability
Currently full

Bulgaria

Cutaway illustration of a mining container — Bulgaria
Ask about the waiting list

The reference offer has no spaces available. Ask us about future availability.

Ask about future availability

Prices exclude VAT. VAT is calculated at checkout.

How we calculate electricity use

We measure the equipment’s power draw with a measuring instrument. Electricity consumption is calculated from the measured power and the actual operating time (uptime).

Plug-in wattmeter measuring the equipment’s power draw.

What the hosting offer covers

Air-cooled miners from 1.5 to 4 kW per device, inclusive. Model suitability is reviewed before placement; hydro, immersion and GPU equipment are outside this hosting offer.

Monthly service
The mandatory €15 monthly fee per miner includes monitoring of mining and device operation and is paid with electricity. Repairs and preventive maintenance are not automatically included.
Getting started
Launch within one week after the equipment is received.
Documents
Hosting agreement and handover certificate.
Ending hosting
Give 30 days’ notice to end hosting. You can collect your equipment afterwards.
Plan your hosting Estimate electricity, monitoring and setup costs for your miners.

The listed rates cover air-cooled miners using 1.5–4 kW each. Hydro, immersion and other equipment need a separate quote.

The estimate shows 30 days. This duration is included in your hosting enquiry.

This enquiry does not reserve space, confirm compatibility or create a contract.

Before you arrange hosting

Check equipment suitability and the cost breakdown before booking delivery.

Will my miner fit this hosting offer?

The current offer covers air-cooled miners from 1.5 to 4 kW per device. Send the model and power details so we can check suitability. Hydro, immersion and GPU systems are outside these terms.

What goes into the estimate?

The calculator separates electricity, monitoring and applicable initial setup costs. The selected location and your equipment details determine the estimate. Confirm space, the final offer and any additional work before committing.

Can I host equipment bought elsewhere?

Yes. Select that you already own the equipment in the calculator. We review its suitability and confirm setup and service terms before accepting it.

How do I start?

Enter the model, quantity and power consumption, choose a location and prepare your WhatsApp enquiry. We confirm capacity and placement terms before you arrange delivery.